Forward to “Zuiho 3/5”

Captain’s Log: Summer of 2016

All the plans were printed on card stock and indexed. The hull was three simple planks of select pine from the local hardware store. I cut the hull to size and glued and nailed the planks together. The hull was flipped over and sanded heavily. I used the hull frame guides I printed to check and recheck the sanding. I couldn’t construct a traditional framed hull as the plans I had only had 20 frames or so: On a ship that would be nearly 7′ long, there were not enough frames to provide the support I figured I needed.

The plans were from a 1:200 card stock version of the ship. They were blown up with Photoshop to 1:100 scale, printed on card stock, cut out and categorized
As rough cut a ship as there ever was. Glue and finishing nails held her together
My trusty B&D belt sander was a godsend!
Detail sanding was done with the B&D Mouse and a Dremel. She is really starting to take shape!

Once the hull was sanded, and the imperfections were filled with automotive filler, she was flipped over and the principle upper hull and structures were also cut and sanded from wood. I also built up the wood hangar wall extension and added cross braces inside the hull. I should mention that this kit marked the first time I had ever worked with styrene sheets, rods and strips. I checked out some videos on YouTube to understand the ins and outs of cutting and working with styrene.

Added her upper levels and the hangar sides as well as the upturned bow, for smoother sailing!
Her stern with the top level hangar placeholders in place

Captain’s Log: Fall of 2016

The next step, to break the “hull monotony”, was to get the flight deck built. The base was a large portion a 4′ x 8′ styrene sheet I bought. I highly recommend buying a large sheet. The single large sheet cost me $22 and I used a good deal of it in the completion of this build. Buying the same amount of styrene in precut packages would have cost 8 to 10 times what I paid for that one sheet. 

I purchased balsam wood planks and styrene sheets of diamond plate from Plastruct. I used extra strength PVC glue to affix the wood planks to the deck. In hindsight, I should have used a harder wood as the balsam marked easily, but the Balsam retained the nicks and scratches that invariably occurred as I proceeded: the real life Zuiho’s deck probably would have had such marks after 3 years of wartime service. I also used wider than scale wood planks since the finished model would have a completely painted flight deck and the deck plank size would basically not be evident. It meant that the arduous task of laying these planks would be facilitated as each plank covered more area. Once the principle work was done on the flight deck, I then proceeded to build the perimeter “guard rails” that extended around the entire flight deck. This was a tedious and exacting task. I was happy to move onto the bow details after finishing those guard rails.

The lateral dividers were put in place as were the flight deck diamond pattern plating.
From bow to stern, the wood planking was completed with a patchwork of styrene plating at the extreme aft.
The diamond pattern plating was installed on the bow and the ground tackle was tackled. There were no definitive drawings of the Zuiho’s ground tackle, so the used the AOTS Takao’s as a rough guide.
Showing off the curved flight deck astern. Some of the platforms were temporarily installed at this point.


I built the support posts from wood and covered them in styrene. The rest of the bow’s deck was covered with the diamond plating. Styrene sheets were used to represent the linoleum the Japanese were fond of using on the decks of the forward superstructure. I built the ground tackle arrangement based loosely on the AOTS Takao reference. At this point I decided to start working on some other details and build the bunk closets the additional gunners were provided. They were added to the ship in 1944 to accommodate the extra crew needed to man the new 25mm guns added to the bow. The bridge exterior was completed at this time. 

The lockers fore of the Bridge as well as the four twin gun platforms were installed.
The wind break and the arrest nets were incorporated into the flight deck at this time, as was the rudimentary first stage of the forward elevator and hangar. It was at this point that I decided to keep the aft elevator in the up position permanently. It was just easier and seemed like allowing both to open was a little redundant.

Back Forward